Nokia Mobile Phones NSE-5 Series Service Manual page 148

Cellular phones
Table of Contents

Advertisement

NSE–5
Service Software Instructions
A DC power supply, a service battery and a 3–wire charger calibration
cable is needed for this calibration.
Note: The Energy Management Calibration process in WinTesla should only be used
when the factory calibration for some reason is not any longer valid in the phone. The
factory calibration of the phone energy management parameters are more precise, thus it
is possible to obtain better battery performance, when the calibration has been performed
in the factory.
Activation
Alt, T,E
The Energy Management Calibration is performed in the following 12
steps:
DC power supply is set to 10.5 Volts.
Mount the service battery on the phone and connect the
service battery with the phone by the charger calibration cable.
Connect the service battery to the DC power supply.
Select the menu Tuning and Energy Management Calibration.
The following dialog pop up:
Select OK. The phone is set to local mode, and the energy
management dialog pops up.
Select settings:
2. Battery voltage
3. Charger voltage
4. Battery size
5. Battery temperature
6. Charge current
Press Run. (If also the setting "Save without confirmation" is selected,
then steps 7 to 11 are not applicable.)
Page 48
Status Bar Text
Initialising local mode...;
PAMS
Technical Documentation
Issue 1 07/99

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents