4. Use the arrow keys or and select the position "><".
The display shows the screen to the side.
5. Press the GO/STOP key to start calibration. Messages
"Measuring..." followed by "Verification" and "Zeroing" are
shown in a sequence on the display.
6. At the end of the compensation procedure, in case the
measured resistance value is ≤5, the instrument emits a
double tone to signal the positive result of the test and
displays the value of the compensated resistance of the
cables, which will be subtracted from all the subsequent
continuity measurements, at the bottom on the right side
of the display.
EN - 12
PV-ISOTEST
15/10 – 18:04
RPE
R
- - -
I t e s t
- - -
STD
2.00
MODE
Lim.
15/10 – 18:04
RPE
R
- - -
I t e s t
- - -
Measuring...
STD
2.00
MODE
Lim.
15/10 – 18:04
RPE
R
- - -
I t e s t
- - -
STD
2.00
MODE
Lim.
m A
- - -
>
<
m A
- - -
>
<
m A
0.06
>
<
Need help?
Do you have a question about the PV-ISOTEST and is the answer not in the manual?
Questions and answers