Removing And Installing Evacuating And Charging Valves On Low And High-Pressure Side - Volkswagen Passat 2011 Workshop Manual

Heating, air conditioner
Hide thumbs Also See for Passat 2011:
Table of Contents

Advertisement

Passat 2011 ➤ , Passat Variant 2011 ➤
Heating, air conditioner - Edition 06.2017
– Using long-nose pliers, pull out desiccant cartridge -1- in di‐
rection of arrow.
Installing
– Install dryer cartridge in reverse order of removal, noting the
following:
Clean upper area of inner surface of receiver, and then moisten
area with refrigerant oil.
Renew sealing cap with O-rings ⇒ ETKA .
Moisten new O-rings with refrigerant oil before fitting.
Note
Do not install dryers which have been left out in ambient air for
longer than necessary.
A dryer which has been exposed to ambient air will be satu‐
rated with moisture in a short time and can no longer be used.
2.7
Removing and installing evacuating and
charging valves on low and high-pres‐
sure side
Version 1
⇒ page 35
Version 2
⇒ page 35
Special tools and workshop equipment required
♦ Torque wrench - V.A.G 1783-
♦ Ratchet insert 1/4" - VAS 6234-
34
Rep. gr.87 - Air conditioning system

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Passat variant 2011

Table of Contents