Installation Tasks - Blue Coat ProxySG 900 Series Maintenance And Upgrade Manual

Table of Contents

Advertisement

Installation Tasks

To install the Blue Coat ProxySG 900 series appliances appliance into an equipment rack, a
qualified technician must perform the following tasks in the numbered order:
Step
Description
1
2
3
4
Assembly"
Assembly"
5
Equipment Rack"
6
!
CAUTION: Bracket and slide rail installation (steps 1- 4) can be performed by a single
technician; however, if a mechanical lift is not used, BlueCoat recommends the assistance
of two additional technicians!
ProxySG 900 Series Maintenance & Upgrade Guide
Page
page 90
page 91
page 92
page 94
or
page 96
or
page 98
page 100
page 101
Slide Rail Kit
89

Advertisement

Table of Contents
loading

Table of Contents