Finalize The Bios Battery Installation - Blue Coat ProxySG 900 Series Maintenance And Upgrade Manual

Table of Contents

Advertisement

8.
Install the new battery ( + positive side up) by inserting it at an angle towards the
battery holder retaining clip and then press down to secure it.
1
9.
Re-install the PCIe riser card / SSL card unit back into the appliance and screw into
place.
10. Re-install the appliance's top cover.

Finalize the BIOS Battery Installation

After you have completed the BIOS battery replacement and have reinstalled all
necessary deployment cables, turn on the appliance.
ProxySG 900 Series Maintenance & Upgrade Guide
BIOS Battery
2
1
85

Advertisement

Table of Contents
loading

Table of Contents