Maintenance and care

7
Maintenance and care
7.1

maintenance

In order to guarantee perfect function, operational safety and service life of the laying machine, the
maintenance work listed in the table below must be carried out after the specified intervals.
Only original spare parts may be used, otherwise the warranty expires.
All work may only be carried out with the laying machine stopped (apply handbrake) and the engine
switched off! It must also be on a horizontal surface.
Unattended parking of the laying machine on inclined surfaces is not permitted.
When carrying out any work on attachments (e.g. HVZ-UNI), it must be ensured that the unit cannot close
unintentionally. Risk of injury!!!
7.1.1

Mechanical

SERVICE INTERVAL
First inspection after
25 operating hours
All 50 operating hours
Minimum 1x per year
(at rough conditions shorten the
interval)
51500024
Maintenance work
Control and tighten all screws and connections.
(The implementation is only allowed by an expert).
Tighten all screws and connections (take care that the tightening torques according to
the property class of the screws are observed).
Check all existing safety elements (such as linchpins) for perfect function and replace
defective safety elements. → 1)
Check all joints, bolts, guidance's and gears for correct function, if necessary adjust or
replace it.
Check all grippers (if available) for signs of wear.
Grease all slidings (if available) when the device is in opened position with a spatula.
Grease all grease nipples (if available) with a grease gun.
Check of all the suspension parts, bolts and straps. Check for corrosion and safety by an
expert.