Operation
Color:
red
Flashing red (4s ON - 1s OFF)
Red and flashing green (4s ON - 1s OFF)
Flashing green (4s ON - 1s OFF)
green
Flashing green (4s ON - 1s OFF)
Green and red flash together.
Before putting the installation machine into operation, the safety regulations must be observed and the
maintenance work carried out.
To ensure safe and trouble-free operation of the installation machine, the following daily checks must be
carried out in particular.
4.2
Daily checks
Before the initial start-up and generally before each start-up, all liquid levels (hydraulic oil, wiping water
(optional)) must be checked and refilled if necessary!
4.2.1
Open cover
•
In order to open the cover ②, the unlocking button ①
on the cover ② must first be actuated.
51500024
Description
Constant or maximum current phase (IUIa).
Voltage regulation phase (IUIa).
Overloading phase (IUIa).
Waiting phase (for equalization) (IUIa).
Loading finished (with CU1 BA2)
Equalizing pulse and floating
Connection with CanConsolle or S/S HW-SW.
①
②
V2
18 / 43
GB