Transport; Transport Of The Installation Machine - probst VM-301-KJ-GREENLINE Operating Instructions Manual

Installation machine
Table of Contents

Advertisement

Transport

5
Transport
5.1

Transport of the installation machine

No lifting equipment is required to move the installation machine onto the trailer or onto the platform of a
truck.
The machine can be driven onto the loading area.
Safe and sufficiently dimensioned ramps must be used - in consideration of the maximum width and the
maximum weight of the installation machine!
The different track widths of the laying machine (front and rear) must always be observed!
The maximum angle of the ramps of < 18 ° (32%) must NOT be exceeded!
The parking brake must be pulled in and the installation machine must be secured against rolling and
shifting in accordance with the regulations of the employers' liability insurance association.
Two lashing lugs are attached to the front and rear of the installation machine for securing purposes:
51500024
V2
31 / 43
GB

Advertisement

Table of Contents
loading

Table of Contents