Stopping (Pausing) a Log

To stop a log that is currently pending or running,
1. First, select the log you wish to pause in the Log Manager
(shown in Figure 7-2 on page 7-4).
2. Then open the Log Menu, scroll to the Pause option, and press
.
[ENTER]
The PM880 returns to the Log Manager, which displays the
highlighted log with "Paused" in the State line.

Restarting a Log

To restart a paused log:
1. First, select the log you wish to restart in the Log Manager
(shown in Figure 7-2 on page 7-4).
2. Then open the Log Menu, scroll to the Start option, and press
.
[ENTER]
The PM880 returns to the Log Manager, which displays the
highlighted log with a status of "Pending" or "Running."

Ending a Log

To end a log:
1. First, select the log you wish to end in the Log Manager
(shown in Figure 7-2 on page 7-4).
2. Then open the Log Menu, scroll to the End option, and press
.
[ENTER]
The PM880 returns to the Log Manager, which displays the
highlighted log with a status of "Finished." The space not used
by the finished log is freed for reuse.
Note: You cannot restart a finished log. You must create a new
log with the same parameters.