Unpacking The At-Ap500 Access Point; Figure 2: At-Tq0091 Ac/Dc Power Adapter - Allied Telesis AT-AP500 Installation Manual

Cloud-managed enterprise-class wireless access point with ieee802.11a/b/g/n/ac dual radio
Hide thumbs Also See for AT-AP500:
Table of Contents

Advertisement

Chapter 2: Installing the Access Point

Unpacking the AT-AP500 Access Point

22
Draft 11-11-2016
As you unpack the access point, check the shipping container for the
components the following items:
One AT-AP500 Wireless Access Point
One AT-AP500 Wireless Access Point Quick Installation Guide
One mounting-bracket screw
One bracket and one base plate for wall or ceiling mounting
If any item is missing or damaged, contact your Allied Telesis sales
representative for assistance.
If you are not using the PoE feature on the LAN port of the access point to
power the device, you need to separately order the AT-TQ0091 AC/DC
Power Adapter. The adapter comes with four regional AC plugs. (One of
the AC plugs comes pre-installed on the adapter.) Refer to Figure 2.
Figure 2. AT-TQ0091 AC/DC Power Adapter
Go to "Installing the Access Point on a Wall or Ceiling" on page 23.

Advertisement

Table of Contents
loading

Table of Contents