Download Print this page

Texas Instruments ADS1271EVM User Manual page 9

Hide thumbs Also See for ADS1271EVM:

Advertisement

www.ti.com
6.1
ADS1271EVM-PDK Block Diagram
A block diagram of the ADS1271EVM-PDK is shown in
circuit boards connected together. The motherboard is designated as the MMB0, while the daughtercard is
the ADS1271EVM described previously in this manual.
MMB0
EVM Connectors
6.2
Quick Start
Ensure that the ADS1271EVM is installed on the MMB0. Place the CD-ROM into your PC CD-ROM drive.
Locate the Setup program on the disk and execute it. The Setup program installs the ADS1271 evaluation
software on your PC. Follow the instructions and prompts given.
After the main program is installed, a dialog box appears with instructions for installing NI-VISA 3.1
Runtime, a self-extracting archive. Click OK to proceed. A WinZip™ dialog appears. Click Unzip, and the
archive extracts itself and automatically runs the NI-VISA 3.1 Runtime installer.
Follow the instructions in the NI-VISA 3.1 Runtime Installer. When prompted for which features to install,
do the following:
1. Click on the disk icon next to NI-VISA 3.1
2. Select, Do not install this feature.
3. Click on the disk icon next to USB.
4. Select the option which installs this feature.
5. Click Next.
Accept the license agreement, and continue the installation.
SBAU107 – November 2004
ADS1271EVM
Control and Data
Interface
Figure 2. ADS1271EVM-PDK Block Diagram
Figure
2. The evaluation kit consists of two printed
C5507
DSP
ADS1271EVM & ADS1271EVM-PDK
Kit Operation
USB
9

Advertisement

loading
Need help?

Need help?

Do you have a question about the ADS1271EVM and is the answer not in the manual?

This manual is also suitable for:

Ads1271evm-pdk