Download Print this page

Texas Instruments ADS1271EVM User Manual page 3

Hide thumbs Also See for ADS1271EVM:

Advertisement

www.ti.com
Pin Number
J1.1
J1.2
J1.3
J1.4
J1.5
J1.6
J1.7
J1.8
J1.15
J1.18
J1.20
J1.9-J1.19 (odd)
J1.10-J1.16 (even)
Pin Number
J4.1
J4.2
J4.3
J4.4
J4.5
Pin Number
J5.1
J5.2
J5.3
J5.4
J5.5
3
Digital Interface
The ADS1271EVM is designed to easily interface with multiple control platforms. Samtec part numbers
SSW-110-22-F-D-VS-K and TSM-110-01-T-DV-P provide a convenient 10-pin, dual-row, header/socket
combination at J2. This header/socket provides access to the digital control and serial data pins of the
ADS1271. Consult Samtec at
options.
Because the ADS1271 devices are capable of daisy-chaining, this EVM has been designed to permit
stacking; up to 4 EVMs can be stacked, allowing for 8 devices to be placed in a signal chain. To
accomodate stacking of EVMs, J2 has some different connections on the top and the bottom side of the
board. Differences between top and bottom connectors are highlighted in
SBAU107 – November 2004
Table 1. Analog Interface Pinout (J1)
Signal
Description
AIN0N
ADS1271 (U7) AINN
AIN0P
ADS1271 (U7) AINP
AIN1N
ADS1271 (U8) AINN
AIN1P
ADS1271 (U8) AINP
Unused
Unused
Unused
Unused
Unused
REF(-)
External reference source low side
REF(+)
External reference source input (2.5V NOM)
GND
Analog ground connections (except J1.15)
Unused
Table 2. Auxiliary Analog Input 1 Pinout (J4)
Signal
Description
AUX1P
Auxiliary Signal Input 1 - Positive terminal
AUX1N
Auxiliary Signal Input 1 - Negative terminal
AUXREF1P
Auxiliary Reference Input 1 - Positive terminal
AUXREF1N
Auxiliary Reference Input 1 - Negative terminal
GND
Ground
Table 3. Auxiliary Analog Input 2 Pinout (J5)
Signal
Description
AUX2P
Auxiliary Signal Input 2 - Positive terminal
AUX2N
Auxiliary Signal Input 2 - Negative terminal
AUXREF2P
Auxiliary Reference Input 2 - Positive terminal
AUXREF2N
Auxiliary Reference Input 2 - Negative terminal
GND
Ground
www.samtec.com
or call 1-800-SAMTEC-9 for a variety of mating connector
ADS1271EVM & ADS1271EVM-PDK
Digital Interface
Table
4.
3

Advertisement

loading
Need help?

Need help?

Do you have a question about the ADS1271EVM and is the answer not in the manual?

Subscribe to Our Youtube Channel

This manual is also suitable for:

Ads1271evm-pdk