Texas Instruments ADS1271EVM-PDK User Manual
Texas Instruments ADS1271EVM-PDK User Manual

Texas Instruments ADS1271EVM-PDK User Manual

Hide thumbs Also See for ADS1271EVM-PDK:

Advertisement

Quick Links

ADS1271EVM and ADS1271EVM-PDK User's Guide
This user's guide describes the characteristics, operation, and use of the ADS1271EVM, both by itself and
as part of the ADS1271EVM-PDK. This EVM is a 24-bit analog-to-digital converter evaluation module.
This document includes an EVM Quick Start, hardware and software details, bill of materials, and
schematic.
The following related documents are available through the Texas Instruments web site at www.ti.com.
SBAU107C – November 2004 – Revised November 2014
Submit Documentation Feedback
ADS1271EVM-PDK
Table 1. EVM-Compatible Device Data Sheets
Device
ADS1271
OPA350
OPA1632
REF1004
REF3125
SN74AVC1T45
SN74AVC2T45
SN74LVC1G125
SN74LVC2G66
SN74LVC2G157
TPS71550
Copyright © 2004–2014, Texas Instruments Incorporated
SBAU107C – November 2004 – Revised November 2014
Literature
Number
SBAS306
SBOS099B
SBOS286
SBVS002
SBVS046A
SCES530C
SCES531D
SCES223L
SCES325G
SCES207I
SLVS338H
ADS1271EVM and ADS1271EVM-PDK User's Guide
User's Guide
1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the ADS1271EVM-PDK and is the answer not in the manual?

Questions and answers

Summary of Contents for Texas Instruments ADS1271EVM-PDK

  • Page 1 This user's guide describes the characteristics, operation, and use of the ADS1271EVM, both by itself and as part of the ADS1271EVM-PDK. This EVM is a 24-bit analog-to-digital converter evaluation module. This document includes an EVM Quick Start, hardware and software details, bill of materials, and schematic.
  • Page 2: Evm Overview

    ADS1271EVM-PDK includes the ADS1271EVM board with the DSP-based MMB0 motherboard, that can be used with provided software to quickly evaluate the device. This manual covers the operation of the ADS1271EVM-PDK. Throughout this document, the abbreviation EVM and the term evaluation module are synonymous with the ADS1271EVM.
  • Page 3: Quick Start

    Installed 1-2 (FMT) SPI Format controlled by software or hardware (S7) Installed 3-4 (MODE) ADS1271 MODE pin controlled via software SBAU107C – November 2004 – Revised November 2014 ADS1271EVM and ADS1271EVM-PDK User's Guide Submit Documentation Feedback Copyright © 2004–2014, Texas Instruments Incorporated...
  • Page 4 ® are not supported. (a) Download the software from the ADS1271EVM-PDK product folder. Unzip the file and locate the Setup program on the disk and execute it. The Setup program installs the ADS1271 evaluation software on your PC. Follow the instructions and prompts given.
  • Page 5: Quick Reference

    Analog ground from MMB0 Analog Inputs Analog inputs and external reference J4/5 Various Analog inputs and external reference to SBAU107C – November 2004 – Revised November 2014 ADS1271EVM and ADS1271EVM-PDK User's Guide Submit Documentation Feedback Copyright © 2004–2014, Texas Instruments Incorporated...
  • Page 6: Basic Usage

    Software www.ti.com Software Once the ADS1271EVM-PDK software (described in Step 4) is installed, evaluation and development with the ADS1271 can begin. Basic Usage Once the evaluation software is started, it checks to see whether an MMB0 is connected. If hardware is connected and recognized, the program downloads the firmware to it, and continues to operate.
  • Page 7 105kSPS. For other modes, it is approximately 52.5kSPS. The application will automatically reduce the data rate to the maximum allowed for that mode that is selected. SBAU107C – November 2004 – Revised November 2014 ADS1271EVM and ADS1271EVM-PDK User's Guide Submit Documentation Feedback Copyright © 2004–2014, Texas Instruments Incorporated...
  • Page 8: Jumpers And Switches

    ADS1271 (U7) AINP J1.3 AIN1N ADS1271 (U8) AINN J1.4 AIN1P ADS1271 (U8) AINP J1.5 Unused J1.6 Unused J1.7 Unused ADS1271EVM and ADS1271EVM-PDK User's Guide SBAU107C – November 2004 – Revised November 2014 Submit Documentation Feedback Copyright © 2004–2014, Texas Instruments Incorporated...
  • Page 9: Analog Input Selection

    S4/S6 Position Analog Inputs Left Input from Buffer Amplifier Middle Input from J1 Right Input from J4/J5 auxiliary inputs SBAU107C – November 2004 – Revised November 2014 ADS1271EVM and ADS1271EVM-PDK User's Guide Submit Documentation Feedback Copyright © 2004–2014, Texas Instruments Incorporated...
  • Page 10 J2.18 DGND Digital ground J2.19 OBCLKSEL Onboard Clock Select: High to select onboard clock instead of external clock. ADS1271EVM and ADS1271EVM-PDK User's Guide SBAU107C – November 2004 – Revised November 2014 Submit Documentation Feedback Copyright © 2004–2014, Texas Instruments Incorporated...
  • Page 11 When used as a stand-alone EVM, the analog power can be applied to J6.2 and J6.6, referenced to J6.13. DVDD can be applied to J6.4 and J6.8, referenced to J6.15. SBAU107C – November 2004 – Revised November 2014 ADS1271EVM and ADS1271EVM-PDK User's Guide Submit Documentation Feedback Copyright © 2004–2014, Texas Instruments Incorporated...
  • Page 12: Reference Voltage

    When CLKXMODE is low, CLKX on J2 is unconnected. A pull-down resistor is installed on CLKXMODE, making low the default setting. ADS1271EVM and ADS1271EVM-PDK User's Guide SBAU107C – November 2004 – Revised November 2014 Submit Documentation Feedback Copyright ©...
  • Page 13: Clock Source

    A 27MHz clock oscillator is included on the EVM and is selected as the clock source for the device when OBCLKSEL (J2.19) is high. SBAU107C – November 2004 – Revised November 2014 ADS1271EVM and ADS1271EVM-PDK User's Guide Submit Documentation Feedback Copyright © 2004–2014, Texas Instruments Incorporated...
  • Page 14: External Oscillator

    When OBCLKSEL (J2.19) is low, an external clock source should be connected to J2.17. In this setting, the onboard clock oscillator is shut down. ADS1271EVM and ADS1271EVM-PDK User's Guide SBAU107C – November 2004 – Revised November 2014 Submit Documentation Feedback...
  • Page 15 SHUNT JUMPER .1" BLACK GOLD 969102-0000-DA NOTE: Any of these part numbers is acceptable for Item # 35 SBAU107C – November 2004 – Revised November 2014 ADS1271EVM and ADS1271EVM-PDK User's Guide Submit Documentation Feedback Copyright © 2004–2014, Texas Instruments Incorporated...
  • Page 16 EVM Bill of Materials and Schematic www.ti.com ADS1271EVM Schematic The schematic diagram is provided as a reference. ADS1271EVM and ADS1271EVM-PDK User's Guide SBAU107C – November 2004 – Revised November 2014 Submit Documentation Feedback Copyright © 2004–2014, Texas Instruments Incorporated...
  • Page 17 REVISION HISTORY ENGINEERING CHANGE NUMBER APPROVED FORMAT DVDD DVDD = FSYNC FMTSEL ALC_SLS121PC GND = SPI FORMAT MODE0 MODE JPR-2X2 24.9K 1% OBREF C30 100N DVDD +3.3VD +3.3VD OPA350UA VCCB VCCA DVDD FMTSEL FSDIR CLKXMODE CLKX_1 CLKX FSDIR REF1004I-2.5 1U 16V X7R FSOUT_1 FSOUT SN74AVC2T45DCT...
  • Page 18: Revision History

    Changed BOM to reflect latest hardware values. NOTE: Page numbers for previous revisions may differ from page numbers in the current version. SBAU107C – November 2004 – Revised November 2014 Revision History Submit Documentation Feedback Copyright © 2004–2014, Texas Instruments Incorporated...
  • Page 19 STANDARD TERMS AND CONDITIONS FOR EVALUATION MODULES Delivery: TI delivers TI evaluation boards, kits, or modules, including any accompanying demonstration software, components, or documentation (collectively, an “EVM” or “EVMs”) to the User (“User”) in accordance with the terms and conditions set forth herein. Acceptance of the EVM is expressly subject to the following terms and conditions.
  • Page 20 FCC Interference Statement for Class B EVM devices NOTE: This equipment has been tested and found to comply with the limits for a Class B digital device, pursuant to part 15 of the FCC Rules. These limits are designed to provide reasonable protection against harmful interference in a residential installation.
  • Page 21 【無線電波を送信する製品の開発キットをお使いになる際の注意事項】 本開発キットは技術基準適合証明を受けておりません。 本製品のご使用に際しては、電波法遵守のため、以下のいずれかの措置を取っていただく必要がありますのでご注意ください。 1. 電波法施行規則第6条第1項第1号に基づく平成18年3月28日総務省告示第173号で定められた電波暗室等の試験設備でご使用 いただく。 2. 実験局の免許を取得後ご使用いただく。 3. 技術基準適合証明を取得後ご使用いただく。 なお、本製品は、上記の「ご使用にあたっての注意」を譲渡先、移転先に通知しない限り、譲渡、移転できないものとします。 上記を遵守頂けない場合は、電波法の罰則が適用される可能性があることをご留意ください。 日本テキサス・インスツルメンツ株式会社 東京都新宿区西新宿6丁目24番1号 西新宿三井ビル 3.3.3 Notice for EVMs for Power Line Communication: Please see http://www.tij.co.jp/lsds/ti_ja/general/eStore/notice_02.page 電力線搬送波通信についての開発キットをお使いになる際の注意事項については、次のところをご覧くださ い。http://www.tij.co.jp/lsds/ti_ja/general/eStore/notice_02.page SPACER EVM Use Restrictions and Warnings: 4.1 EVMS ARE NOT FOR USE IN FUNCTIONAL SAFETY AND/OR SAFETY CRITICAL EVALUATIONS, INCLUDING BUT NOT LIMITED TO EVALUATIONS OF LIFE SUPPORT APPLICATIONS.
  • Page 22 Notwithstanding the foregoing, any judgment may be enforced in any United States or foreign court, and TI may seek injunctive relief in any United States or foreign court. Mailing Address: Texas Instruments, Post Office Box 655303, Dallas, Texas 75265 Copyright © 2014, Texas Instruments Incorporated...
  • Page 23: Important Notice

    IMPORTANT NOTICE Texas Instruments Incorporated and its subsidiaries (TI) reserve the right to make corrections, enhancements, improvements and other changes to its semiconductor products and services per JESD46, latest issue, and to discontinue any product or service per JESD48, latest issue.
  • Page 24: Texas Instruments

    Mouser Electronics Authorized Distributor Click to View Pricing, Inventory, Delivery & Lifecycle Information: Texas Instruments ADS1271EVM ADS1271EVM-PDK...

This manual is also suitable for:

Ads1271evm

Table of Contents