Download Print this page

Texas Instruments ADS1271EVM User Manual page 4

Hide thumbs Also See for ADS1271EVM:

Advertisement

Power Supplies
Pin Number
Signal
J2.1
SYNC
J2.2
MODE0
J2.3
CLKX
J2.4
DGND
J2.5
SCLK
J2.6
MODE1
J2.7
Unused.
J2.8
FSDIR
J2.9
Top: FSOUT
Bottom: FSR
J2.10
DGND
J2.11
Unused
J2.12
CLKRMODE
J2.13
Top: DIN
Bottom: DOUT
J2.14
CLKXMODE
J2.15
Unused
J2.16
SCL
J2.17
EXTCLK
J2.18
DGND
J2.19
OBCLKSEL
J2.20
SDA
4
Power Supplies
J3 provides connection to the common power bus for the ADS1271EVM. Power is supplied on the pins
listed in
Table
5.
Signal
+AVDD: +15V to power buffer amplifier section
+5VA
DGND
+1.8VD
+3.3VD
4
ADS1271EVM & ADS1271EVM-PDK
Table 4. Digital Interface Pinout (J2)
Description
Synchronization Control
0 = High-Speed Mode
1 = Low-Power Mode
(In either case, only if Mode1=1)
CLKXMODE = 1: master clock output
CLKXMODE = 0: no connection
Digital ground
Serial Clock
0 = High-Resolution Mode
1 = Mode determined by MODE0
Indicates FSR direction:
0 = Output (DRDY in SPI mode)
1 = Input (FSYNC mode)
FSOUT: in FSYNC mode, copy of FSR; in SPI mode, not connected
FSR: in FSYNC mode, frame-sync input; in SPI mode, DRDY output from U8
Digital ground
0 = Use CLKR for SPI Clock
1 = Use ADC Clock for SPI clock
Top: Serial data input
Bottom: Serial data output
0 = CLKX is High Z
1 = CLKX outputs ADC master clock
2
I
C bus serial clock
External ADC clock input
Digital ground
Onboard Clock Select:
High to select onboard clock instead of external clock.
2
I
C bus data line
Table 5. Power Supply Pinout
Pin Number
1
2
3
4
5
6
7
8
9
10
Signal
–AVDD: –15V to power buffer amplifier section
Unused
AGND
Unused
+5VD
SBAU107 – November 2004
www.ti.com

Advertisement

loading
Need help?

Need help?

Do you have a question about the ADS1271EVM and is the answer not in the manual?

Subscribe to Our Youtube Channel

This manual is also suitable for:

Ads1271evm-pdk