Switching Off; Preparation For Transport - Pfeiffer Vacuum OmniStar GSD 300 O1 Operating Manual

Gas analysis system
Table of Contents

Advertisement

5.4 Switching off

Procedure
Terminate Balzers Quadstar™
Turn off the mains switch
Turbo pump run out time ≈ 10 min

5.5 Preparation for Transport

Preconditions
2
Unit switched off (
24)
Turbo pump has run out to standstill (≈ 10 min)
Procedure
Place the transport fixing parts (
Carefully pack the unit (use the original packing material)
24
Operation
2
11)
BG 805 071 BE
(9904)
GSD300.om

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents