Single Phase Power Connections - R&M LOADMATE LM Series Installation And Maintenance Manual

Table of Contents

Advertisement

LM01 I&M MANUAL/EN/11.30.2010
2.7

Single Phase Power Connections

Figure 3. Single Phase Control Box Power Connections
PE
L1
L2
POWER
CABLE
GLAND
1. Remove control box cover.
2. Insert power supply cable through power cable gland (Figure 3).
3. Connect power leads L1 and L2 to terminal strip (Figure 3).
4. Connect ground wire PE to terminal strip (Figure 3). Refer to wiring diagram.
5. Insure terminals are tight
6. Tighten cable gland or connector (Figure 3) to secure power cable.
7. Replace control box cover.
8. Attach pushbutton assembly to plug (Figure 3).
This document and the information contained herein, is the exclusive property of R&M MATERIALS HANDLING, INC. and represents a non-public, confidential and proprietary trade secret
that may not be reproduced, disclosed to third parties, altered or otherwise emplo yed in any manner whatsoever without the express written consent of R&M MATERIALS HANDLING, INC.
Copyright © (2010) R&M MATERIALS HANDLING, INC. All rights reserved.
PUSHBUTTON
PLUG
13/65

Advertisement

Table of Contents
loading

Table of Contents