Placards And Instructions - R&M LOADMATE LM Series Installation And Maintenance Manual

Table of Contents

Advertisement

LM01 I&M MANUAL/EN/11.30.2010
NOTICE:
It is a responsibility of the owner / user to install, inspect, test, maintain, and operate a
hoist in accordance with the ASME B30.16 Safety Standard, OSHA Regulations, and ANSI
/ NFPA 70, National Electric Code. If the hoist is installed as part of a total lifting system,
it is also the responsibility of the owner / user to comply with the applicable ASME B30
volume that addresses other types of equipment used in the system.
Further, it is the responsibility of the owner / user to require that all personnel who will
install, inspect, test, maintain, and operate a hoist read the contents of this manual,
LoadMate® Electric Chain Hoist Operator's Manual,
Overhead Hoists (Underhung), OSHA Regulations, and ANSI / NFPA 70, National Electric
Code. If the hoist is installed as part of a total lifting system, all personnel must also
read the applicable ASME B30 volume that addresses other types of equipment used in
the system.
m
DANGER: Failure to read and comply with any one of the limitations noted in this manual
can result in product failure, serious bodily injury or death, and / or property damage.
R&M MATERIALS HANDLING, INC.
application.
Conforming to good safety practices is the responsibility of the owner, the user, and its
operating personnel.
Only those Authorized and Qualified Personnel who have shown that they have read and have understood
this manual and the
LoadMate® Electric Chain Hoist Operator's Manual
the hoist.
The owner / user SHALL ensure that all Operators read and understand the
Hoist Operator's Manual
1.5

Placards and Instructions

READ and OBEY all Danger, Warning, Caution, and Operating Instructions on the hoist and in this manual
and
LoadMate® Electric Chain Hoist Operator's Manual.
legible.
Failure to comply with safety precautions in this manual and on the hoist is a safety violation that may result
in serious injury, death, or property damage.
This document and the information contained herein, is the exclusive property of R&M MATERIALS HANDLING, INC. and represents a non-public, confidential and proprietary trade secret
that may not be reproduced, disclosed to third parties, altered or otherwise emplo yed in any manner whatsoever without the express written consent of R&M MATERIALS HANDLING, INC.
Copyright © (2010) R&M MATERIALS HANDLING, INC. All rights reserved.
has no direct involvement or control over the hoist's operation and
prior to operating the hoist.
ASME B30.16 Safety Standards for
should be permitted to operate
LoadMate® Electric Chain
Make sure that all placards are in place and
8/65

Advertisement

Table of Contents
loading

Table of Contents