EB-E01 series
3.3.6.3 Shutter
DISASSEMBLY PROCEDURE
1. See
Flowchart (p70)
and remove all parts up to the component below from
the projector.
Upper Case (Assy) (p80)
2. Remove the two screws ( ) and remove the "Shutter (Assy)".
(The following procedure does not apply to EB-E01/E10.)
3. Remove the screw ( ) and remove the "Switch Cable H721-A".
4. Remove the following parts:
Shutter frame
Shutter ball
Shutter Spring
Lens Shutter
Shutter Lens Sheet
SEIKO EPSON
Disassembly and Assembly
Shutter Lens Sheet
Switch Cable H721-A
87
INTERNAL USE ONLY
Shutter frame
Lens Shutter
Shutter ball
C.B.P-TITE SCREW,2.5X8,F/ZN-3C
C.P.F.TYPE1 P-TITE SCREW,1.6X8,F/ZN-3C
Shutter Spring
Revision A