Service Reminder" Function; Cleaning And Removing Internal Components - Riello Steel Pro Power 114-2 P Installation, Technical Assistance Service And System Management Manual

Table of Contents

Advertisement

COMMISSIONING AND MAINTENANCE
3.9.1

"Service reminder" function

The thermal module is fitted with a function that reminds the
user of the need to carry out planned maintenance on the ap-
pliance after a number of hours defined in the maintenance
plan.
When this maintenance activity is required, the following text
appears on the normal display: "Maintenance required!"
This text will remain active until the technical support service
resets the internal meter after maintaining the appliance.
The user can check at any time how many hours miss from the
next planned maintenance activity by accessing the "Informa-
tion" menu
Menu
"
"
Central Heating (CH)
"
"
Domestic Hot Water (DHW)
"
Information
"
"
Settings
"
"
and selecting "Maintenance" using the ▲ / ▼ arrows
Information
"
"
Service
"
"
The menu also shows the hours from the last maintenance ac-
tivity performed and access to a log that lists the dates of the last
15 maintenance activities.
Service
"
"
Service history
"
"
Burn hours since last service
"
Burn hours till service
"
"
Reset Service Reminder
"
The "Settings" → "Boiler set." → "Maintenance" menu contains
the advanced controls for this function, which, in any case, are
only available if you access it with the manufacturer password.
If it is necessary to use this access level, contact the Technical
Assistance Service.
"
"
"

3.10 Cleaning and removing internal components

Before any cleaning operation, disconnect the electric power
supply by switching the main system switch to "off".
OUTSIDE
Clean the casing, the control panel, the painted parts and plastic
parts with cloths moistened with soap and water. In the case of
stubborn stains, moisten the cloth with a 50% water and alco-
hol mixture or specific products.
0
Do not use fuels, sponges impregnated with abrasive solu-
tions or powder detergents.
INSIDE
Before starting internal cleaning operations:
− close the gas shut-off valves
− close the system taps.
Access to the control panel and the internal modular system
parts
− open the module door (or the left door if two doors are
present).
− Unscrew the two screws (1) placed on the panel.
− Fold the panel forward (2) making it rest on the two rub-
ber pads. At this point you have full access to the terminal
blocks (3).
1
2
3
Once the maintenance operations are complete, refit the com-
ponents working in the opposite direction of what was de-
scribed.
82
3

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents