Riello Steel Pro Power 114-2 P Installation, Technical Assistance Service And System Management Manual page 78

Table of Contents

Advertisement

COMMISSIONING AND MAINTENANCE
For all models
− Open the general fuel shut-off valve.
− Open the tap of the unit you are working on.
− Place the main system switch, the main switch of the
module and the one of the unit on which you are work-
ing on "ON".
− Make sure that there is no heat or DHW demand.
It is now necessary to change the setting of the parameter 98.
Proceed as follows:
− On the home screen of the control panel, press the ● key
− Select "Settings" with the ▲ / ▼ keys and press the ● key
− Select "Device configuration" with the ▲ / ▼ keys and
press the ● key
Settings
"
"
Boiler Settings
"
"
Clock Settings
"
"
PB Configuration
"
"
Appliance Configuration
"
− Enter the password as described in paragraph "Password
access"
− Select the unit between "Master" and "Dep1 ... N"
− Press the ▼ button, select "(98) Model Setup" and press
the ●
Appliance Configuration
"
(97) IO Configuration
"
"
(98) Appliance Settings
"
"
Configuration Confirmed
"
− With the ▲ / ▼ keys change the value following what is in
the following table and press the ● key:
Model
Steel Pro Power 114-2 P/V
Steel Pro Power 140-2 P/V
Steel Pro Power 180-2 P/V
Steel Pro Power 230-2 P/V
Steel Pro Power 270-2 P/V
Steel Pro Power 300-3 P/V
Steel Pro Power 345-3 P/V
Steel Pro Power 405-3 P/V
Steel Pro Power 460-4 P/V
Steel Pro Power 540-4 P/V
"
"
1
2
No
"
"
"
Parameter 98
12
10
8
4
2
6
4
2
4
2
− Press the ▼ key, select "Config. Confirmed" and press the
● key
− With the ▲ / ▼ keys change the value to "Yes" and press
the ● key
Appliance Configuration
"
(97) IO Configuration
"
(98) Appliance Settings
"
Configuration Confirmed
"
At this point the systems starts an application update process.
Once this is finished, the menu "Settings" appears on the menu.
Repeat this operation for all the modules.
− Press ◄ until you return to the home screen
An error message is displayed for a few seconds and then the
display returns to its normal state.
Apply the new gas label supplied in the kit on completion of the
conversion.
Gruppo termico regolato per:
G30 - G31 28-30/37 mbar
Paese di destinazione:
After installing the accessory, check all gaskets tightness.
Carry out all calibration activities described in Paragraph "Ad-
justments".
Restore the desired set points.
78
"
1
"
4
"
Yes
"
"
"

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents