Riello Steel Pro Power 114-2 P Installation, Technical Assistance Service And System Management Manual page 47

Table of Contents

Advertisement

To access the terminal jigs operate in this way:
− open the module door (or the left door if two doors are
present).
− Unscrew the two screws (1) placed on the panel.
1
− Fold the panel forward by placing it on the two rubber
pads. At this stage, you have full access to the terminal
jigs.
MO1
MO2
MO1
Low voltage managing terminal jig MO1
MO2
High-voltage managing terminal jig MO2
M1D2 Low voltage terminal jig of the first dependent M1D2
M2D2 High voltage terminal block of the first dependent
M2D1
IG
Main switch
FCV1
Cable guide
FCV2
Cable guide
IG
FCV1
M1D2
FCV2
M2D2
Connect the power cables to the main switch (IG).
FCV1
FCV2
MO1
Control signals terminal board
MO2
Output terminal board
IG
Main switch
FCV1
Cable guide
FCV2
Cable guide
9
Always keep the power cables and signal cables separate.
Route the signal cables to the top of the control panel and
secure them to the cable clamp FCV1. Pass the power cables
through the lower part of the panel and secure them with
the cable clamp FCV2.
The cables must exit the machine through the appropriate cable
glands (2) placed on the side panels and at the bottom.
2
47
INSTALLATION
IG

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents