Riello Steel Pro Power 114-2 P Installation, Technical Assistance Service And System Management Manual page 75

Table of Contents

Advertisement

− Press the MENU key, select "System test" and press ● to
confirm.
Menu
"
"
Domestic Hot Water (DHW)
"
Information
"
"
Settings
"
"
System Test
"
"
− select the unit between "Master" and "Dep1 ... N"
System Test
"
"
Boiler
"
"
− select "Max. power" with the ▲ / ▼ keys and press ● to
confirm. The fan starts turning at its maximum speed
(which can vary based on the model).
System Test
"
"
Test State
"
"
Fan Speed
"
"
Ionisation
"
"
DESCRIPTION
Wobbe index
Nominal supply pressure
After the checks:
− select "OFF" with the ▲ / ▼ keys and press ● to confirm.
− Disconnect the pressure gauge and tighten again the
pressure test point screw (1) upstream from the gas valve.
System Test
"
"
Test State
"
"
Fan Speed
"
"
Ionisation
"
"
− After completing the operations, close the module doors.
"
Managing
"
"
High Power
"
"
0
rpm
"
"
0.0 μA
G20
G30
G31
45,7
80,6
70,7
MJ/m
20
28-30
37
mbar
Off
"
"
0
rpm
"
"
0.0 μA
3
75
COMMISSIONING AND MAINTENANCE

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents