Checks During And After Initial Start-Up - Riello Steel Pro Power 114-2 P Installation, Technical Assistance Service And System Management Manual

Table of Contents

Advertisement

COMMISSIONING AND MAINTENANCE
Service
"
"
Burn hours since last service
"
Burn hours till service
"
"
Reset Service Reminder
"
Clear Service History
"
"
You can scroll the list by using the ▲ / ▼ keys.
3.2

Checks during and after initial start-up

When the appliance it started, it must be checked by stopping
and then restarting the thermal module in the following way:
− Set the operating mode of the thermal module in heating
to 0 (Par. 1) e and close the RT input to generate a heat
request
− If inecessary, increase the setpoint value (Centralized
Heating → Heating Set) till all units start
Menu
"
"
Central Heating (CH)
"
"
Domestic Hot Water (DHW)
"
Information
"
"
Settings
"
"
− Make sure that all the pumps in the system are free and
rotate in the right direction
− Check the full stop of the thermal module and the heat
demand by opening the "RT" contact (OFF).
− Check that the thermal module has come to a complete
stop by setting the main switch of the equipment and
the main switch of the system to "off".
0
hrs
"
"
"
2000
hrs
"
"
No
"
"
"
No
"
"
"
If all conditions are met, power the thermal module by setting
the system's and the appliance's master switches to "On" and
test combustion products (see Paragraph "Adjustments").
SUPPLY GAS PRESSURE CHECK
− Turn the main system switch "off"
− Access the module and identify the unit you want to
check (it is not necessary to do it for all the units)
− Loosen by about two turns the pressure inlet screw (1) up-
stream of the gas valve and connect the pressure gauge
− Power the thermal module by setting the system's and
the appliance's master switches to "On".
74

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents