Checks During And After Initial Start-Up - Riello ALU PRO power Series Instructions For The Installer And The Technical Assistance Centre

Aluminium condensing boilers
Table of Contents

Advertisement

CHECKS DURING AND AFTER INITIAL START-UP

Once the boiler has started up, make sure that it shuts
down and re-starts properly:
- Changing the central heating temperature setpoint
(see page 58)
- Using the main switch of the control panel
- Using the room thermostat or the hourly programmer
Make sure that all the pumps in the system are free and
rotate in the right direction.
Turn the mains power switch to "off" and make sure that
the boiler shuts down completely.
If all the conditions are satisfied, restart the boiler and
carry out an analysis of the combustion products, first
for each module and then for the entire boiler. To do
so, unscrew the plug (1) and insert the combustion anal-
ysis probe into the socket at the rear of the boiler.
1
49
TECHNICAL ASSISTANCE CENTRE

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents