Procedures before operation
8. Procedures before operation
Figure 29:
Procedure before
operation
(communications with
the QJ71E71-100)
(1) Procedures before operation
(a) Communications with the QJ71E71-100
The following is a procedure to establish communications between the WS0-
GETH and the QJ71E71-100.
*1
QJ71E71-100
Mount the QJ71E71-100
on the base unit.
Connect an Ethernet cable.
Configure network
parameters (for Ethernet)
with GX Developer.
Create a ladder program.
Execute a PING test
to check for existence
of the WS0-GETH.
*1 For details, refer to the Q Corresponding Ethernet Interface Module User's Manual (Basic).
Procedure before operation
Check operations.
End
MELSEC-WS
WS0-GETH
Connect the WS0-GETH
to the MELSEC-WS
CPU module.
Connect an Ethernet cable.
Configure configuration
data with Setting and
Monitoring Tool.
Write the configuration
data to the module
with Setting and
Monitoring Tool.
66