3 Setting up and commissioning the application
3.1 Wiring
Setting up and commissioning the
3
application
3.1
Wiring
The figure below shows the hardware setup of the application.
Figure 3-1: Wiring
L1
L2
L3
N
PE
Note
Note the setup guideline in the manuals of the respective devices (see /1/, /4/, /6/).
SINAMICS G120 DP at S7-1200
Entry-ID: 70155469,
V1.4,
L1
L2
L3
PE
SINAMICS
G120C DP
U2 V2 W2
PB
M
Y
07/2018
L+ M PE
L1 N PE L+ M
PB
LAN
24 V DC
LAN
M L+
SIMATIC Panel
KTP600
SIMATIC S7
CPU 1212C
9