Power On Procedure - Zeta Alarm Systems SMARTCONNECT SMART6 Installation Manual

Multi-loop panel
Table of Contents

Advertisement

Smart Connect Multi-loop Installation Manual

Power on Procedure

1.
After the above has been completed, turn the panel on (Via AC Only). The panel will follow the same power up sequence
described in initial power up section above
2.
The panel will now display one of the following messages
Message
www.zetaalarmsystems.com
Meaning
The Panel has not detected any modules fitted during its
power up check.
Power down the panel and check that the expected
modules are fitted, and that all module cables are
correctly inserted.
Note that the panel will need at least one module fitted
to run.
The panel has detected a new module added to a port
that was previously empty.
This is the usual message seen the first time a panel is
configured
The panel has detected a different type of module fitted
to a port that was previously occupied.
The panel has detected a module fitted to a port that is
the same type, but it`s serial number has changed.
This could happen if a loop module was swapped with
another one, for example.
The panel has detected no module fitted to a port that
was previously occupied.
21

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SMARTCONNECT SMART6 and is the answer not in the manual?

Questions and answers

Sanoop
April 18, 2025

How to identify double address detector

User image 6802a93cb31b4
1 comments:
Mr. Anderson
May 10, 2025

To identify a double address detector in the Zeta Alarm Systems SMARTCONNECT SMART6, check the DIP switch address settings. A double address detector will respond to two consecutive addresses. If two detectors are configured with the same DIP switch settings or respond to the same address, this indicates a double address condition. Use the DIP switch table to verify that each detector has a unique address.

This answer is automatically generated

Table of Contents

Save PDF