Operation; Switching On; Displays / Information; Functions Of All Keys / Displays - Kessel Aqualift S XL Instructions For Installation, Operation And Maintenance

Pumping station, for wet installation, with rod guide
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 35
5

Operation

The backwater preventers must be functional during operation, see <2> in Fig. [6], page 10
During operation, the shut-off valve must always be opened and locked with the safety bracket.
5.1

Switching on

Turn the main switch <28> to position I (ON), following a successful
system test the system information appears in the display <29> and
the green LED <30> lights up, the control unit is ready for operation.
5.2

Displays / information

Various operating states with text are shown on the display. All the
system parameters can be retrieved via menu 1 (see the control unit
operating manual). The level of liquid in the wastewater tank is shown
on the display (filling level) in mm. (0 means it is below the measurable
height)
5.3

Functions of all keys / displays

19
LED
20*
LED
21
LED
22
LED
66
Cursor up
67
Cursor down
68
ESC
69
Alarm
71
Pump / Test
72
OK
73*
Pump / Test
* Pumping station model type DUO (2 pumps)
010-992
Operation
Pump 1
Pump 2
Alarm
Ready for operation
Scrolling in the menu
Scrolling in the menu
Deletion of an entry, back
Acknowledge the acoustic alarm
Pump 1 ON / OFF
Confirmation of an entry, next level
Pump 2 ON / OFF
54 / 208
29
28
Ill. [16]
66
68
67
72
Ill. [17]
30
32
31
22
21
69
71
73
20
19
2018/07

Advertisement

Table of Contents
loading

This manual is also suitable for:

Aqualift f xl

Table of Contents