Unpacking Procedure; Cutting The Tape And Straps - Dell EMC DLm8500 Data Domain Physical Planning Manual

Disk library for mainframe
Hide thumbs Also See for DLm8500 Data Domain:
Table of Contents

Advertisement

Unpacking procedure

Before unpacking the unit, allow it to stabilize for 16 hours.
About this task
CAUTION
Before moving the unit over a raised floor, ensure that the floor meets
the requirements that are listed under
Follow these steps to unload and unpack the cabinets:
Procedure
1. Use a mechanical lift or pallet jack to position the packaged cabinet in its final
location.
Note:
Before placing the cabinets, note the correct placement (based on
the overall system configuration) and the floor tile cutouts to place each
cabinet.
Leave approximately 96 in. of clearance at the back of the cabinet to unload the
cabinet and roll it off the pallet.
2. Remove the shipping material:
a. Cut the tape and straps that hold the cardboard carton together as
illustrated in the next diagram.
Figure 15 Cutting the tape and straps
b. Remove the cardboard packing hood and wraparound sleeve as illustrated in
the next diagram.
Disk Library for mainframe Physical Planning Guide for DLm8500
DLm8500 System Service Area and Removal
System placement
on page 50.
EMC2838
53

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the DLm8500 Data Domain and is the answer not in the manual?

This manual is also suitable for:

Dlm8500 powermax

Table of Contents