Mitsubishi 900 Series User Manual page 6

Graphic operation terminal
Hide thumbs Also See for 900 Series:
Table of Contents

Advertisement

[Backlight Changing Precautions]
• Before changing the backlight, always turn the GOT power OFF (when using a GOT bus
connection, also turn OFF the PLC CPU power), and remove the GOT main unit from the panel
before changing the backlight.
Not switching the power off in all phases may cause an electric shock.
Not removing the unit from the enclosure can cause injury due to a drop.
• When replacing the backlight, use the gloves.
Otherwise, it may cause you to be injured.
If you should directly touch the plated area of the main unit case with hand, be sure to wipe off
the fingerprint and so on, and install the main unit case.
Otherwise, it may cause a trouble or malfunction.
• Start changing the backlight more than 5 minutes after switching the GOT power off.
Not doing so can cause a burn due to the heat of the backlight.
[Disposal Precautions]
• When disposing of the product, handle it as industrial waste.
A - 5
DANGER
!
CAUTION
!
CAUTION
!
A - 5

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents