Installation; Delivery; Incoming Inspection; Packing - Car-O-Liner CTR12000 Instruction Manual

Hide thumbs Also See for CTR12000:
Table of Contents

Advertisement

Car-O-Liner Group AB

3 Installation

3.1

Delivery

3.2

Incoming inspection

3.3

Packing

3.4
Installation
41643, ENG - rev. 2, 2016-10
Our welding plants are mostly factory-preassembled and ready to be plugged
in, meaning that the welding power source is equipped with 8 m power cable
and 32 A plug.
Further equipment being part of standard version delivery (other versions see
section 3.9):
1 complete set of C-tong arms (40 mm, 80mm, 350 mm, 500 mm)
1 tube of very conductive grease for lubricating the tong arms
1 operating, maintenance and spare parts manual
1 wheel extension kit
Remove the original packing. Be careful and check whether all the parts
stated on the delivery note have been received and are in perfect condition
without any damage.
According to legal regulations, the purchaser shall bear the transport risk, so
that it is strongly recommended to have confirmed any recognized damage
by the driver who shall take it down on the delivery note. Do not put into
service faulty appliances! Immediately notify the damage to the supplier!
Properly dispose of the original packing in accordance with applicable envi-
ronmental protection regulations!
The place of installation must satisfy the following conditions:
Enclosed room; the welding machine is not intended for operation in
the open.
Ambient temperature must range between 0 and 40° C at a
maximum height of 1000 m above sea level.
Operate the welding machine only in well-ventilated, clean rooms
where no vapors or exhalation of acids may be produced.
CTR12000
20

Advertisement

Table of Contents
loading

Table of Contents