Premier Mounts SpiroLock SPI-PRO Installation Instructions Manual page 9

Universal projector mount
Table of Contents

Advertisement

SPI-PRO
Solid Ceiling Installation (cont'd)
Step 3
­
­
Move the SpiroLock™ Ceiling Plate back into
position.
®
­
Thread a wedge anchor nut (and washer, if provided
with the wedge anchor) onto each threaded wedge
anchor shaft.
Do not tighten any of the wedge anchor nuts (and any
washers) until all nuts and washers are threaded onto
the shafts.
Do not overtighten the wedge anchor nuts.
If applicable, drill a hole above the mounting hole for
wiring access.
Step 4
­
­
Secure the SpiroLock™ and close nipple onto the
Ceiling Plate.
®
­
Use an M3 Allen wrench to tighten the M6 x 6mm
Lock-It™ screws in the Ceiling Plate and SpiroLock™
twist lock collar.
Do not overtighten the Lock-It™ screws.
¯
­
Route any cables up through the SpiroLock™ and
into the ceiling structure.
Proceed to "Attaching the Projector Plate" on
page 11.
Installation Instructions
Visit the Premier Mounts website at http://www.mounts.com
M6 x 6mm Lock-It™
Screws
Page 9

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SpiroLock SPI-PRO and is the answer not in the manual?

Table of Contents