Checks Of Readiness For Operation; Connecting A Test Lung - Dräger Oxylog 2000 Operating Instructions Manual

Emergency & transport ventilator
Hide thumbs Also See for Oxylog 2000:
Table of Contents

Advertisement

Checking Readiness for Operation
- after exchanging the patient valve
- after cleaning and reassembly
- at least every 6 months.
NOTE: Always log checks for documentation purposes.

Connecting a Test Lung

The test lung consists of an elbow for attaching the wye,
an ET-tube adapter size 7 mm for simulation of airway
resistance, and a 2 L ventilation bag for simulation of
compliance.
Remove elbow from flow sensor.
Insert test lung elbow to patient connector at flow
sensor.
Connect gas supply:
Open gas cylinder valve slowly and completely,
or
engage gas supply hose to wall terminal with quick
connect probe.
(part no. 84 03 201)
Checking Readiness for Operation
Connecting a Test Lung
23

Advertisement

Table of Contents
loading

Table of Contents