Tests of Readiness for
Operation
Tests of Readiness for Operation
Prior to initial operation
Verify that supplied voltage agrees with the values
indicated on the rating plate next to the power cable.
Prior to each use
Has the device been disinfected?
Are the surrounding panels locked securely into place,
and closed?
Are all panels free of cracks and sharp edges?
Is the correct mattress in the bassinet?
Operation with mattress heater
operation without mattress heaer:
Does the bed tilt properly and lock securely into
position?
Is the thermometer in the cover (if applicable)?
Are accessories and therapy equipment available and
in proper working order?
Is the gas supply for any devices used available and
sufficient?
Are all circuits and patient lines installed securely and
properly?
CAUTION !
Never route patient circuits or lines over top of
panels – they may get pinched when folding up
panels or when installing cover.
16
gel mattress,
foam rubber
mattress.