Slide 121
No additional notes
Moving a Finisher
Turn the system off and unplug
the main machine from the
power source.
Disconnect the finisher I/F cord
from the upstream unit (or main
machine).
Make sure that the front door of
the finisher is closed.
Loosen the screws of the caster
cover (x2).
Push the caster up until it stops
and is not touching the floor.
Tighten the caster cover screws.
This prevents the caster from
snagging on a carpet or door
jam when the finisher is
pushed along the floor.
After the finisher has been
moved to its new location,
lower the caster again and
tighten the screws.
121
BR-C1 Training