Ricoh BR-C1a Basic Service Training page 270

Table of Contents

Advertisement

Replacement and Adjustment
Removing the Old Developer - 2
Slide 270
 Not all the old developer is removed. About 145 g remains (same as Aries).
Attach this bottle to the machine to
catch the old developer.
Check the bottle and make sure that
it is locked in place. (You should hear
a click.)
Keep the front doors open. Turn on
the machine.
When you see "Please Wait" and then
"Door Open" on the operation panel,
execute SP3022-001 to start draining
the developer.
 Draining developer requires about
150 seconds.
 If the operation fails, the machine
will alert you with a message. Do
SP3023-001 to check the result,
and then repeat the procedure.
 Not all the old developer is
removed. About 145 g remains.
Switch the machine off, and then
remove the bottle.
270
BR-C1 Training

Advertisement

Table of Contents
loading

This manual is also suitable for:

Br-c1a spBr-c1b spBr-c1c spD179D180D181

Table of Contents