When replacing the controller board, first, check
which SDK applications have been installed
(such as the OCR Unit). After replacing the
controller board, re-install the SDK applications
by following the installation instructions for each
application.
After reinstalling the SDK applications, print the
SMC (SP-5-990-024/025 (SMC: SDK/Application
Info)).
Slide 173
No additional notes
Replacement
Controller Board (2)
173
BR-C1 Training