Download Print this page

Section 2: Optional Assembly & Set-Up - Land Pride SB10 Series Operator's Manual

Hide thumbs Also See for SB10 Series:

Advertisement

Section 2: Optional Assembly & Set-up
372218
Hydraulic Chute Rotation Assembly (SB2584 Shown)
Figure 2-3
Hydraulic Chute Rotation
Refer to Figure 2-3:
IMPORTANT: Adjustment screws on hydraulic
motor (#7) are preset at the factory. Do not change
factory settings. Changing factory settings can
cause structural damage to the Snow Blower.
1.
Attach hydraulic motor mount (#4) to mainframe (#3)
as shown with three 3/8"-16 x 1" GR5 cap
screws (#5) and hex flange locknuts (#6). Draw
locknuts up snug, do not tighten at this time.
2. Adjust hydraulic motor mount (#4) in slots "A" until
drive gear teeth (#2) are fully engaged with driven
gear teeth (#1). Make sure drive gear (#2) does not
grind against driven gear (#1).
3. Hold hydraulic motor mount (#4) in this position and
tighten all three hex flange locknuts (#6) to the
correct torque.
4. Attach quick disconnect couplers (#10) (couplings
furnished by customer) to 3/4" MORB end of
3/8" x 81" hydraulic hoses (#9A & #9B) and tighten.
5. Attach 9/16" MORB x 9/16" MJIC adapter (#8A) to
hydraulic motor port "A" and tighten.
6. SB2584 model only: Insert 9/16" FJIC end of
hydraulic hoses (#9A & #9B) through slots "D" .
7.
Attach hydraulic hose (#9A) to adapter (#8A) and
tighten.
8. Attach 9/16" MORB x 9/16" MJIC adapter (#8B) to
hydraulic motor port "B" and tighten.
9. Attach hydraulic hose (#9B) to adapter (#8B) and
tighten.
10. Attach High Pressure Fluid Decal 848-747C (#11) in
the location shown. See "Safety Labels" on page 4
for detailed instructions.
11. Coil hydraulic hoses (#10) around Snow Blower
mainframe for safe keeping.
1/23/19
Table of Contents
Electric Chute Rotation
Refer to Figure 2-4:
1.
Attach upper motor mount (#5) to mainframe (#4) as
shown with three 3/8"-16 x 1" GR5 bolts (#6) and hex
flange locknuts (#7). Draw locknuts up snug, do not
tighten at this time.
2. Adjust upper motor mount (#5) in slots "A" until drive
gear (#2) is fully engaged with driven gear (#1). Make
sure drive gear (#2) does not grind against driven
gear (#1).
3. Hold upper motor mount (#5) in this position and
tighten all three hex flange locknuts (#7) to the
correct torque.
4. Check vertical height of drive gear (#2). It should be
at the same height as the driven gear (#1). If needed,
change drive gear height as follows:
a. Loosen 3/8"-16 hex flange locknuts (#10) and
adjust lower motor mount up or down until top of
drive gear (#2) is even with top of driven
gear (#1).
b. Tighten hex flange locknuts (#10) to the correct
torque.
5. Plug wire harness (#8) to electric motor (#9).
6. Coil wire harness (#8) up and store on the Snow
Blower mainframe.
SB1051, SB1064, SB1574, & SB2584 with S/N 881641+ Snow Blowers 370-430M
Electric Chute Rotation Assembly
Figure 2-4
37085
11

Hide quick links:

Advertisement

loading

This manual is also suitable for:

Sb1051Sb1064Sb1574Sb2584