Figure 13 Locating and Removing the Customer Access Covers
1.
Customer Access Cover
2.
Socket Head Cap Screw (4)
Figure 14 Electrical Connections at the Surge Suppressor
1.
User-supplied Cable
Page 36
Wiring the Instrument
6. Reinstall the cover.
7. Ensure the voltage setting switches are in the correct position, see
section 2.2.2 on page 38
8. Supply power to the instrument after completion of all auxiliary wiring and
after upper door is secured.
3.
4.
2.
and
Figure 17 on page
Power Supply Access Cover
Stainless Steel Socket Head Cap Screw (4)
To Power Supply Module
UVTOCUnpacking Installation Setup.fm