Panasonic DVCPRO HD AJ-HDC27VP Service Manual page 602

Vtr
Hide thumbs Also See for DVCPRO HD AJ-HDC27VP:
Table of Contents

Advertisement

5-5. Supply & Take-up Reel Rotor Unit Replacement
<Supply Reel Rotor Unit Replacement>
(Removal)
1.
Disconnect the connector P2614 on the
Servo P.C.Board.
2.
Turn the Emergency Gear until S1 Post move
to center loading position and remove the S5
Post Base Unit (Refer to item 5-14).
3.
Pull up the Arm Return Spring on the
Connection Arm Angle Side and disconnect
the Connection Arm Angle.
4.
Unscrew the 2 screws (C) to remove the
Supply Reel Stopper as shown in below
figure.
5.
Push the Reel Table to middle position and
unscrew the 2 screws (D) to remove the
Supply Reel Rotor Unit as shown in Figure 5-
5.
6.
Remove the 2 Cut Washers to remove the
ldler Arm Unit.
<Take Up Reel Rotor Unit Replacement>
(Removal)
1.
Disconnect the connector P2615 on the Servo
P.C.Board.
2.
Unscrews the 2 screws (E) and then remove
the Take Up Reel Stopper.
3.
Push the Reel Table to middle position and
unscrew the 2 screws (F) to remove the Take
Up Reel Rotor Unit as shown in below figure.
(Installation for both unit)
1. Install the new Reel Rotor Unit according to the
opposite procedures of removing.
2. After change the both Reel Rotor Unit, "Reel
Torque Adj." And "Main Brake Torque Confi."
Procedures Should be Performed.
CAUTION: Don't touch FG portion with the
magnetized screw driver.
Figure 5-5
MECH-35

Advertisement

Chapters

Table of Contents
loading

Table of Contents