Panasonic DVCPRO HD AJ-HDC27VP Service Manual page 513

Vtr
Hide thumbs Also See for DVCPRO HD AJ-HDC27VP:
Table of Contents

Advertisement

4. Maintenance Schedule
Part Name
-
Cleaning of the tape transport
1
Cylinder Ass'y
2
Pinch Arm Unit
3
Cleaning Arm Unit
4
S,T Reel Motor Unit
5
Thrust Screw Unit
6
S1 Loading Arm Unit
7
T1 Boat Unit
8
S5 Post Base Unit
9
Tension Arm Unit
10
S,T Cass. Brake Arm U.
11
Mode Switch Unit
12
A/C Head
13
Loading Motor (1) Arm Unit.
14
Pinch Solenoid
15
S,T Brake Solenoid
16
L Switch Base Unit
17
Cleaner Solenoid
18
Main Cam Gear
19
Mechanism Unit
20
Cassette Compartment Unit
Replacement of the mechanism chassis unit is recommended for the 12,000 h maintenance.
"C"
: Perform cleaning.
"R"
: Assembly subject to exchange.
"Y"
: The timing of replacement with Cleaning Arm Unit,
either 1000 hours or 1 year as timing come earlier.
"G"
: At the time of replacement, wipe off the old grease
and apply new grease. (Molytone Grease)
"L"
: Lubrication is necessary.
"IM" : Included in the mechanical chassis unit
when the mechanical chassis unit is not replaced,
replacement as a single part is required.
1,000H
2,000H
4,000H
R
R, Y, G
R, Y, G
R, Y, G
R, Y
R, Y
<Note:>
The Hours of use indicates the cylinder rotation time
(DRUM RUN).
The maintenance execution time shown in the chart
is recommendation for standard maintenance
execution.
This is not the life of the various parts.
The life is influenced by temperature, humidity, dust,
etc.
INF-6
Hours of Use (unit hours)
6,000H
8,000H
"C": every 500 hours
R
R
R, Y, G
R, Y, G
R, Y
R, Y
R, Y
R
R
R,L
10,000H
12,000H
R
R
IM
R, Y, G
IM
R, Y
IM
R
IM
IM
R
IM
R
IM
R
IM
R
IM
R
IM
R
IM
IM
IM
IM
IM
IM
IM
IM
IM
IM

Advertisement

Chapters

Table of Contents
loading

Table of Contents