2-5. IER-F + IER-F L-Type Installation
Samsung Electronics
• When there is any L-type installation, install the L-type Frame Kit first of all.
• For L-type installation, use
two JIG Fs
(CY-LJRNEF).
• Align the fastened Stud with the L Support and then fasten JIG screws. (Fig 17)
• Fasten two Frame F Sides in the
L mark of the JIG
F.
• Align the Stud of JIG with the JIG hole of the Frame, and then fasten the JIG screws.
Adhere to the Wall
• Adhere the inner side of L Support to the wall.
• Fasten the Frame F to the wall with screws.
Fastened
Positions of
L Support
L
SUPPORT
Fastening
Fastening
Positions of
Screws
Frame F
Fig 17. JIG F with the L Support Fastened
Fig 16. Fastening Positions of L-type JIG
Fig 18. Fastened L-type JIG
92