Ier + Ier-F Extension (Up To Down) - Samsung IER Series Installation Manual

Led display
Hide thumbs Also See for IER Series:
Table of Contents

Advertisement

2-2. IER + IER-F Extension (Up to Down)

• When F is installed horizontally on the installed IER Frame, use the default JIG of IER
(included in VG-LFR84FWL, VG-LFR53FWL, and
• The Stud location of the default JIG must be adjusted (FIG 9).
• Align the JIG Stud with the JIG hole of the Frame.
*Be sure to check the hole locations – IER: 270 mm / IER-F: 240 mm
• Fasten the Frame F to the wall with screws.
Fig 9. Before and After Changing the JIG Stud Location
VG-LFR52SWL).
Screw
Fastening
F FRAME
Fig 10. Shape of Mounted JIG
IER
FRAME
Fig 11. IER-F Installed to the Bottom of IER
Samsung Electronics
IER
IER-F
89

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ifr seriesIer-f seriesIfr-f seriesLh0 ier seriesLh0 ifr seriesLh020ier ls series ... Show all

Table of Contents