4. Cabinet + Frame Installation
◇ PIVOT installation
When installing the PIVOT, use the PIVOT-specific Frame Kit.
(VG-LFR51PWL / the same installation steps apply)
① Check that the BOLT ETCs are fastened. (Fig.1)
② Fasten the BOLT ETCs again appropriately for PIVOT installation. Fasten
two additional bolts and remove the COVER HANDLEs. (Fig.2)
③ Install with the arrow pointing up, by referring to the engraving indicating
the direction.
Fig1. Positions of BOLT ETCs fastened in delivered product
Remove the COVER HANDLEs
Fig2. Positions to fasten BOLT ETCs when installing the PIVOT
Samsung Electronics
Engraving indicating
the PIVOT direction
33