Installation; Power Supply Control Cabinet Mounting; Photocell Housing - TWR Lighting E-1DBSL Manual

Dual medium intensity led / strobe
Hide thumbs Also See for E-1DBSL:
Table of Contents

Advertisement

DUAL MEDIUM INTENSITY LED/STROBE
2.0

INSTALLATION

THIS SYSTEM OPERATES AT HIGH VOLTAGE LEVELS THAT COULD BE
LETHAL
MAINTENANCE WORK MUST BE DONE BY QUALIFIED SERVICE
PERSONNEL ONLY.
PERFORMING MAINTENANCE ON THIS SYSTEM, MAKE SURE THE POWER
IS TURNED OFF AT THE SERVICE BREAKER PANEL!!
READ AND UNDERSTAND THE THEORY OF OPERATION AND ITS SAFETY
MESSAGES BEFORE ATTEMPTING INSTALLATION/MAINTENANCE OF THIS
SYSTEM.
SWITCHES IN THE CONTROLLER AND STLDBEACON!!
2.1

POWER SUPPLY CONTROL CABINET MOUNTING

The power supply control cabinet can be located at the base of the structure or in an
equipment building. Mounting dimensions can be found in Section 1.2, on page 1.
Pay particular attention when choosing your controller mounting location to ensure
proper door opening and room for service personnel. Refer to installation drawings
INS-264, and HDO-264, for ease of install.
2.2

PHOTOCELL HOUSING

The standard photocell housing is supplied with a 20' pigtail of 16 AWG type TFFN
wire. On occasion in mounting of the photocell an additional amount of wire may be
required. Refer to drawing 100239, for proper assistance on determining gauge of
wire for your specific needs.
M.2006 MANUALS.E-1DBSL
REV. 08/10/04, 12/09/05, 2/08/06, 04/11/06 (load resistor)
REV. 06/21/06 (part numbers), 7/13/06 (Appendix & 6.0 Major Comp. List)
REV 10/20/06 (Appendix & parts lists)
REV. 04/10/07 (text)
MODEL E-1DBSL
WARNING DANGER!!!
TO
SERVICE
PERSONNEL.
WHEN PERSONNEL IS INSTALLING SYSTEM OR
DO NOT ATTEMPT TO DEFEAT THE INTERNAL SAFETY
ALL
INSTALLATION
AND
2

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the E-1DBSL and is the answer not in the manual?

Table of Contents