Operating Instructions & Function Tests; Prestart - Mec Crossover Series Operator's Manual

Table of Contents

Advertisement

Crossover Series
Operating Instructions & Function Tests
DO NOT operate this machine until you have read and understood this manual, have performed the Workplace Inspection,
Pre-Start Inspection and Routine Maintenance, and have completed all the test operations detailed in the Operating
Instructions section.
This section provides instructions and tests for each function of machine operation. Follow all safety rules and instructions. The
operator must conduct inspections and a Functions Test of the machine before each work shift to check that all machine systems are
working properly.
Test the machine on a firm level surface with no debris, drop-offs, potholes or overhead obstructions. Perform each step outlined in
this section.
This machine shall only be operated by trained and authorized personnel. If multiple operators use this machine, all must be trained,
qualified and authorized to use it. New operators must perform a Pre-Start Inspection and Functions Test prior to operating the
machine.
Operators must comply with all employer and job site rules and governmental regulations regarding the use of personal protective
equipment.
DO NOT use a machine that is malfunctioning. If any function does not perform as described, tag the machine and remove for repair
by a qualified service technician. After repairs are completed, a Pre-Start Inspection and Functions Test must be performed before
using the machine.

Prestart

ART_3817
ART_2356
Page 12
June 1, 2012
• Perform Prestart Inspection (see page 31).
• Check Emergency Stop Switches at both the base and platform controls – turn
clockwise to reset.
• Check Battery Disconnect Switch outside the Battery Module.
Must be in ON position.
Operating Instructions & Function Tests
92555
Crossover Series

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

2659ert3259ert

Table of Contents