Chapter 3: General Installation Guidelines
Safety and Preliminary Checks
Observe the following safety and preliminary checks before and during each installation:
Verify that you are at the location specified on the Site Work Order.
l
Verify that the site is safe for you and your equipment.
l
Notify the customer of your presence, and tell the customer that you will need access to
l
the water meter.
If the Site Work Order does not have an MIU ID number on it, write the ID numbers of the
l
E-CODER you are installing. If the Site Work Order already has an MIU ID number on it,
verify that it matches the ID number on the MIU you are installing.
6
E-CODER ®
)R450
i ™ Installation and Maintenance Guide