Other Sample Configuration Emails; Completing The Activation - Neptune E-CODER) R450i Installation And Maintenance Manual

Table of Contents

Advertisement

Chapter 5: Activating and Testing the E-CODER

Other Sample Configuration Emails

RSSI Validation Test Failed
If an E-CODER)R450i fails the validation test for RSSI during the installation process, the
system sends an email or SMS showing a Marginal or Failed RSSI value. In the following
example email, note the Failed downlink value [–107] as well as the Marginal uplink value
[–107] .
Register Test Failed
If an E-CODER)R450i fails the error-check test on the register read during the installation
process, the system sends the following email. This indicates that there is a problem with the
wiring to the register.

Completing the Activation

Do one of the following:
If a valid register connection and acceptable RSSI values are reported, then go to
l
"Completing the E-CODER
If the E-CODER)R450i does not report acceptable RSSI values, check the antenna.
l
If the register connection is returned as invalid, then go to "Completing the
l
E-CODER
14
®
)R450i™
®
)R450i™ Installation" on the facing page.
®
)R450i™ Installation" on the facing page. 
E-CODER ®
)R450
i ™ Installation and Maintenance Guide

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the E-CODER) R450i and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents