Page 2
ARB® UTILITY MANAGEMENT SYSTEMS™ WATER ELECTRIC HP Turbine Installation and Maintenance Guide...
Page 3
ARB® UTILITY MANAGEMENT SYSTEMS™ WATER ELECTRIC HP Turbine Installation and Maintenance Guide...
Page 4
This manual is an unpublished work and contains the trade secrets and confidential information of Neptune Technology Group Inc., which are not to be divulged to third parties and may not be reproduced or transmitted in whole or part, in any form or by any means, electronic or mechanical, for any purpose, without the express written permission of Neptune Technology Group Inc.
Page 5
INSTALLING THE HP TURBINE Installation Instructions ............................1-1 Recommended Installation ..........................1-1 Before Operation..............................1-3 MAINTENANCE Adjusting the HP Turbine Calibration Vane......................2-2 1-1/2” and 2” HP Turbines .........................2-2 3” - 20” HP Turbines...........................2-3 HP TURBINE INSTALLATION AND MAINTENANCE GUIDE...
Page 6
........................................HP TURBINE INSTALLATION AND MAINTENANCE GUIDE...
This chapter is designed to take you through the installation process for the High Performance (HP) Turbine. The HP Turbine offers the widest operating range of any turbine meter on the market. To achieve optimum performance in actual service, it is essential that you follow these installation instructions.
When installing HP Turbine meters, always follow normal good piping practice. Specifically, all gaskets should be centrally located on the flanges with no overlap or interference with the pipe diameter. This is particularly important at the inlet connection to the meter where a gasket protruding into the flow stream will cause unpredictable velocity conditions.
BEFORE OPERATION Before putting the HP Turbine meter in service follow these steps: With outlet-side gate valve closed, SLOWLY open inlet-side valve to pressurize meter. SLOWLY open outlet-side gate valve until downstream line is pressurized.
Page 10
........................................HP TURBINE INSTALLATION AND MAINTENANCE GUIDE...
Remove old maincase gasket and replace a new gasket. Install factory-calibrated unit into maincase. Replace cover bolts. Tighten cover bolts. Open valves. All UMEs have been factory calibrated and should not require field calibration. HP TURBINE INSTALLATION AND MAINTENANCE GUIDE...
Page 12
Refer to meter installation instructions. The complete UME should be returned for service to Neptune. If the customer does not have a spare unit, a factory-calibrated exchange unit may be purchased from Neptune. Neptune encourages all customers to purchase either a spare UME complete or a UME exchange contract to enable them to avoid service interruptions.
Page 13
Turning the adjustment stem 15 in either direction results in approximately 1% change in registration. The full range of the adjustment stem is 180 (see Figure 2.3). Figure 2.3 3” - 20” HP Turbines HP TURBINE INSTALLATION AND MAINTENANCE GUIDE...
Page 14
........................................HP TURBINE INSTALLATION AND MAINTENANCE GUIDE...