Side Assembly - Alton Evolution Octagonal 9x9 Instruction Manual

Table of Contents

Advertisement

Side Assembly

Start by attaching the cast
Diagram 6
External
eaves brackets (EV1000M) to
four eaves rails (EV0953).
First of all drill pilot holes
through the eaves bracket
into the end of the eaves
bar. Be careful not to drill all
the way through the rail!
Once the bracket is firmly in
position fix with the 40mm
countersunk (CSK) screws
(diagrams 5 and 6).
EV1000M
40mm Screw
X 4
Diagram 5
Dia. 6
EV0953
Once you have attached all the cast eaves brackets you can fix two standard side glazing bars
(EV0969) to each of the prepared eaves rails. Make sure the glazing bar is tight into the bracket
(diagrams 7 and 8), drill pilot holes and fix using 50mm CSK screws. Don't over tighten these screws
as it may make it difficult to glaze later in the build.
Diagram 8
Internal
Diagram 7
EV1000M
External
4
7

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Evolution Octagonal 9x9 and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

Evolution octagonal

Table of Contents